Food and Plant Building Achieves Code Compliance with Aeroseal

Home » Blog » Food and Plant Building Achieves Code Compliance with Aeroseal

The Site:

The Mt Albert campus, close to the city, is the Research facility’s head office. The site features new purpose -built buildings and glasshouses alongside several historical building and employs around 300 staff including 180 research staff.

The Problem:

The consultancy firm who visited the site are renowned for their stringent enforcement of air flow criteria. After spending the better part of a week directing the subcontractor to apply mastic to the ductwork, Adrian of 1st Mechanical called in the LIMS Aeroseal team to Aeroseal the ductwork.

The Solution:

Two days later we had our van onsite. All entry points to the ductwork were in the same room which made for smooth transitions from one injection point to the next. All five runs were sealed to an excellent standard (one of them being the best result we’ve ever achieved: 1.6L/s @ 500 Pascals). The whole job was done in one day; hope we get to work with these guys again, they were great.

Duct sealing from the inside
Contact
info@lims-hvac.co.nz
095713229
022 675 9426
© 2022 LIMS Aeroseal. All rights reserved.